As part of the electrification of its bus fleet, the Société de transport du Saguenay (STS) has installed fast charging stations for electric buses. 3E Eng. was commissioned by Prowatt to conduct a level 2 harmonic current emission study at the common connection point (CCP) in accordance with Hydro-Québec’s requirements.
The study aimed to validate the project’s compliance with the limits prescribed by Hydro-Québec’s C.25-01 standard.